Business

FAA finds ‘multiple instances’ of Boeing quality control issues

Washington DC (CNN) — The Federal Aviation Administration has found multiple problems with Boeing’s production practices, follow a six-week audit of Boeing triggered by the January 5 door plug blowout on an Alaska Airlines Boeing 737 Max 9.

Posted Updated

By
Gregory Wallace
and
Pete Muntean, CNN
CNN — Washington DC (CNN) — The Federal Aviation Administration has found multiple problems with Boeing’s production practices, follow a six-week audit of Boeing triggered by the January 5 door plug blowout on an Alaska Airlines Boeing 737 Max 9.

This is a developing story. It will be updated.

The-CNN-Wire™ & © 2024 Cable News Network, Inc., a Warner Bros. Discovery Company. All rights reserved.

Copyright 2024 by Cable News Network, Inc., a Time Warner Company. All rights reserved.